跳至主要内容

博文

目前显示的是 八月, 2020的博文

How to build a cost-saving cold room for Peanut Storage

  Peanut storage conditions have significant effects on overall quality. With   H.Stars   standards for roof pitch, ventilation and other building standards, farmer stock peanut warehouses or cold room are the best solution. Here are some suggestions on one of the type peanut cold storage. Description of Peanut Cold Storage 1. Project details: The specific parameters of the Peanut Cold Storage are as follows: a. Cold storage size: 30m (length) × 25m (width) × 4.5m (height) b. Cold storage temperature: 10 ℃ c. Cold storage goods: peanuts without shell d: Storage capacity of cold storage: 1000Ton 2. After calculation, the chiller capacity of the cold storage is: 150kw 3. Refrigeration system description (1). This project adopts:  efficient refrigeration chilled water system . a. The main refrigeration equipment of the high-efficiency chilled liquid refrigeration system is the water cooled chiller unit. After commissioning and testing in the factory, the whole chilled can be shipped to cu

H.Stars Group industrial water screw chillers are ranked top 75 of the world tire industry

  Anhui Jiatong Tire Co., Ltd. is a large-scale tire manufacturing enterprise solely established by Jiatong Group Singapore Jiatong Tire Co., Ltd. Among the 55 major tire manufacturers in China, Anhui Jiatong ranks first in tire production and sales; in the world tire industry The Top 75 ranked 21st in total sales in 2001. The  chilled water supply system  mainly provides 7-12℃ chilled water for the rubber mixer machine, 7-12℃ chilled water is provided by the "H.Stars" water cooled industrial chillers, and then the chilled water is transported to 3 mixers through the system point. In the whole chilled water supply system solution, not only industrial water chiller with appropriate cooling capacity must be selected, but also the system safety, energy saving, convenient operation and reduction of personnel management costs and other factors must be fully considered, according to the other party's process requirements and existing condition. After many in-depth discussions a

Meet in Chongqing,Meet in Refrigeration Exhibition | Hstarschiller.com

  The 31st International Exhibition on Refrigeration, Air Conditioning, Heating, Ventilation and Food Frozen Exhibition (abbreviated as China Refrigeration Expo 2020) will be held at Chongqing International Expo Center from August 19 to 21, 2020. At that time, Guangzhou United A/C&R Co., Ltd. will bring its self-developed all-stainless steel products, titanium tube evaporator, and H.Stars centrifugal condenser and evaporator to the exhibition. Welcome everyone to visit and guide. 1. Booth introduction (1)Time: August 19-21, 2020 (2)Location: Chongqing International Expo Center (No. 66 Yuelai Avenue, Yubei District, Chongqing) (3)Booth number: N5 B21 2. Exhibits introduction (1)  Centrifugal heat exchanger Refrigerant: R22, R134a. Design and manufacturing standards: GB/T 151-2014, NB/T 47012-2010. Product features: The evaporator is equipped with a liquid separation and defoaming device, and the liquid separation and defoaming device has obtained a national patent. The heat exchange

H.Stars ±0.1℃ high-precision chiller for Laboratory of the university

Project Background The Synchrotron Radiation Laboratory of the University of Science and Technology of China has built China's first dedicated synchrotron radiation source mainly based on vacuum ultraviolet and soft X-rays. To ensure the reliability and stability of the light source, it is necessary to provide stable constant-temperature cooling water in the device. The temperature should be controlled within the range of 42±0.1℃, and the temperature of the constant temperature cooling water of other components which touched water should be controlled within the range of 20-25±1℃. First cooperation In January 2018, H.Stars immediately formed a professional technical team after receiving the demand for this project, and conducted discussion and research according to the technical requirements of the National Synchrotron Radiation Laboratory. After 40 days, we finally developed and produced a ±0.1℃ high-precision chiller that meets the technical requirements of the National Synchrotr