With the continuous improvement of domestic industrial production capacity, industrial chillers are more and more favored by enterprises. However, during the installation process of industrial chillers, some installation problems are often encountered. So how do we properly install an industrial chiller? 1. After unpacking the new machine, first check the accessories in the box according to the list, so as to avoid the failure of normal installation of the chiller due to the lack of accessories. After confirmation, follow the installation drawings and installation sequence provided by the chiller manufacturer. The water-cooled chiller needs to be installed with a cooling water system. After the cooling tower pipeline is installed, ensure that the water circulation is normal. 2. Please ensure that the working voltage of the chiller is stable and normal. Make sure the power socket is in good contact and the ground wire is grounded reliably. It is necessary to pay attention to whether
We provide one-stop solution to HVAC customers, specializing in R&D, production, design and installation. Main products: Air Cooled Chiller, Water Cooled Chiller, Industrial Chiller, Multi-function Chiller, Hot Water Unit, Heat Recovery Unit, Heat Pump Unit, Condensing Unit, Low Temperature Chiller, Shell and Tube Heat Exchanger, Air Handling Unit, Fan Coil Unit, Cooling Tower, etc.