跳至主要内容

博文

目前显示的是标签为“Air cooled screw chillers”的博文

How to debug a screw chiller - oumalchiller.com

  An important step in the commissioning of screw chillers and scroll chillers is the charging of refrigerant. Generally,   Oumal screw chillers  are filled with the specified type of refrigerant before leaving the factory. After the chiller arrives at the chiller installation site, first check whether the screw chiller is damaged during transportation, check the high and low pressure gauges, and confirm whether the chiller is in good condition. If it is found that the refrigerant is insufficient or leaking, you need to find out the leak place and fix it, and then add the specified type of refrigerant according to the product instructions. For some screw chillers, the refrigerant needs to be emptied for transportation due to transportation problems. Therefore, after the machine arrives at the installation site, the refrigerant needs to be added again, and the appropriate refrigerant must be added according to the manufacturer's requirements. Before adding refrigerant, the air in th